Our Projects
ACHIEVEMENTS
Foundation Construction Of The Power Plant
The turbines have been constructed by General Electric; in charge of the instrumentation, electrical and mechanical works. Pipeline transportation of oil, gas and water for long distances. Our group succeeded to implement more than 5 big projects in Iraq and the GCC, with different sizes and types. We are using all types of pipes and vales depending on applications and end-user request. Sewage and pumping stations our company has dedicated staff for sewage construction and maintenance pumping stations.
Site preparation Work
The Scope of this project content; and not limited to; excavation of topsoil, Filling Type 1 (General Fill), Filling Type 2 (Structural Fill).
With material obtained from borrow pits and sorted/mixed to meet specification requirements, placed in layers while not exceeding 200mm in thickness above the rough grade area for flood alleviation purposes and compacted to achieve 95% maximum dry density.