Skip links

Our Projects

ACHIEVEMENTS

Foundation Construction Of The Power Plant

The turbines have been constructed by General Electric; in charge of the instrumentation, electrical and mechanical works. Pipeline transportation of oil, gas and water for long distances. Our group succeeded to implement more than 5 big projects in Iraq and the GCC, with different sizes and types. We are using all types of pipes and vales depending on applications and end-user request. Sewage and pumping stations our company has dedicated staff for sewage construction and maintenance pumping stations.

Site Clearance and General Filling

This project is included and not limited to the following activities of area clearance,

  • Remove the debris
  • Remove the weak soil
  • Backfill in many layers

Construct The Interior And Outer Roads

Foundation Of Electric Towers

Foundation Of Fire Water Valve At Eni-Iraq

Foundation Of Instrumentation And Telecoms, With
International Telecom Providers

132 KV OHTL Tower Basra-Governate

Temporary Fencing for BP

Site preparation Work

The Scope of this project content; and not limited to; excavation of topsoil, Filling Type 1 (General Fill), Filling Type 2 (Structural Fill).

With material obtained from borrow pits and sorted/mixed to meet specification requirements, placed in layers while not exceeding 200mm in thickness above the rough grade area for flood alleviation purposes and compacted to achieve 95% maximum dry density.

Other Projects